How many kWh of battery do I need?
Start by identifying critical loads and required backup duration, then calculate energy demand and check compatibility with the inverter and electrical system.
BACKUP & BATTERY
Storage and backup designed from the critical loads that really need power, for homes, businesses, farms and sites with unstable supply.
CHALLENGE
Battery selection is not capacity alone. The design needs to know which loads must continue, for how long, and how the existing system can integrate storage.
ENGINEERING APPROACH

SCOPE
OUTCOME
Frequently asked questions
Start by identifying critical loads and required backup duration, then calculate energy demand and check compatibility with the inverter and electrical system.
It depends on simultaneous load, battery capacity, inverter power and budget. Many projects therefore prioritise critical loads to keep the system practical.
No. If the objective is mainly daytime solar use without backup, On-grid may be sufficient. Hybrid is more relevant when storage or backup is a clear requirement.
Transfer behaviour depends on the inverter, transfer equipment and system architecture. Some loads require a shorter transfer time, so critical loads and equipment requirements should be identified during design.
Runtime depends on the actual power demand of selected loads, usable battery capacity and operating conditions. It should not be estimated from battery size alone.
WARRANTY & EQUIPMENT
The proposed equipment models, relevant standards and warranty conditions are explained clearly for each project.
Selected to match the site and approved quotation.
Relevant standards or qualification documents are provided according to the proposed work scope.
Confirmed separately for equipment, workmanship and manufacturer conditions.
PROJECT PROOF
Before / After images help show the original site condition, the areas improved and the finished workmanship more clearly.
PROJECT INQUIRY
Send an electricity bill, site photos, property type or the problem you want to solve. You do not need to know the system size or equipment model first. The team will assess the direction and tell you what to prepare next. It takes about 1–2 minutes.
The A SERVICE team will review the details and contact you to discuss the project. If you would like to talk now, contact us via LINE or phone.