This article is introductory guidance for preparing a project discussion, not a site-specific engineering design or performance guarantee.

Solar Rooftop

Prepare electricity bills, roof photos from several angles, electrical-board photos, site location and the period of highest electricity use.

Solar Water Pump / Smart Farm

Prepare photos of the water source, existing pump, pipe route, delivery point, approximate elevation, water-use zones and coordinates.

EV Charger / Electrical

Prepare photos of the electrical board, main breaker, installation point, route distance and the vehicle or target equipment specification.

If you do not know the numbers

Send what you already have. The team can use the first information to identify what should be measured or prepared before a survey.

You can start even if the information is incomplete

An electricity bill, board photo, roof photo, water-source photo or site pin is enough to start a more focused conversation.